Repairing Historic Flat Plaster Walls and Ceilings (Part E)

The first base coat put on wood or metal lath. The wet plaster is "scratched" with a scarifier or comb to provide a rough surface so the next layer of base coat will stick to it.
The brown coat is the second application of wet, base-coat plaster ...
More Information

Leave a Comment:

(required)

(will not be published) (required)


Copyright © 1999-2012 Data Growth Pty Ltd. All rights reserved.
Privacy Policy | Terms of Use |