Changes At The Main Panel

Article about changes made to main electrical panel when adding a new sub-panel.
The 6-3G sub-feed cable is run into the main circuit breaker panel. The ground and neutral wires are connected to the ground bar. The two hot wires are connected to ...
More Information

Leave a Comment:

(required)

(will not be published) (required)


Copyright © 1999-2012 Data Growth Pty Ltd. All rights reserved.
Privacy Policy | Terms of Use |